Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction project planning and scheduling
Author
Patrick, Charles
Additional Author(s)
-
Publisher
Upper Saddle River, NJ: Pearson Education, Inc, 2004
Language
English
ISBN
0130924806
Series
-
Subject(s)
BUILDING-PLANNING
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 189-198
Bibliography: p. 199-200. Index: p. 201-204
Abstract
-
Physical Dimension
Number of Page(s)
xv, 204 p.
Dimension
24 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02443/05
- 690.068 Pat C
Library - 7th Floor
Available
Similar Collection
by author or subject
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Pengaruh motivasi dan disiplin kerja terhadap produktivitas pekerja pada proyek X
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier
Analisa rumus empiris kuat tekan kolom dengan penggunaan fiber reinforced polymer pada kondisi : non-burnt, burnt-curing, dan burnt non-curing
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial