Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Author
Untung, Donny
Additional Author(s)
Jessica, Stephanie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012176/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-CASE STUDIES
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 58-85
. Bibliography: p. 57.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02799/17
(T) SIP 1217
Library - 8th Floor
Available
Similar Collection
by author or subject
Cara pendekatan perhitungan kuantitas pembesian pada pelat lantai struktur beton bertulang
Project management
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Essentials of project and systems engineering management
Pemodelan kriteria-kriteria pemilihan tower crane pada proyek konstruksi
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya