Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Author
Untung, Donny
Additional Author(s)
Jessica, Stephanie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012176/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-CASE STUDIES
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 58-85
. Bibliography: p. 57.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02799/17
(T) SIP 1217
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisa faktor yang mempengaruhi tahapan investasi pengembang perumahan
Studi banding macam-macam denda keterlambatan penyelesaian proyek konstruksi
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Planning and monitoring design work
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera