Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Author
Untung, Donny
Additional Author(s)
Jessica, Stephanie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012176/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-CASE STUDIES
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 58-85
. Bibliography: p. 57.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02799/17
(T) SIP 1217
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi kasus pengaruh change order terhadap keterlambatan proyek pada proyek X
Program komputer untuk penyiapan kebutuhan bahan dalam proyek konstruksi
Penelitian awal penanganan kontraktor terhadap direct waste material pada proyek konstruksi di Surabaya
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Faktor-faktor risiko penyebab sengketa dan kejelasan pembagian tangung jawabnya
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Manajemen risiko pada kecelakaan kerja di proyek konstruksi