Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Author
Untung, Donny
Additional Author(s)
Jessica, Stephanie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012176/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-CASE STUDIES
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 58-85
. Bibliography: p. 57.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02799/17
(T) SIP 1217
Library - 8th Floor
Available
Similar Collection
by author or subject
Manajemen konstruksi
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Faktor-faktor risiko penyebab sengketa dan kejelasan pembagian tangung jawabnya
Studi kasus analisis rumah tumbuh di jalan raya pakal dilihat dari aspek pemasaran dan keuangan
Proyek Grand City
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta