Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Author
Kennardi, Christian
Additional Author(s)
Setiadi, Ivan Pratama
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011887/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 107 - 125
Bibliography : p. 106
Abstract
-
Physical Dimension
Number of Page(s)
xixi, 125 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00911/13
(T) 658.404 Ken P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
The power of design-build
Diskriminasi terhadap karier wanita dalam perusahaan kontraktor
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Survey pemanfaatan teknologi informasi pada industri konstruksi di Surabaya
Faktor sukses kemitraan antara kontraktor dan subkontraktor pada proyek mall di Surabaya
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi