Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Author
Kennardi, Christian
Additional Author(s)
Setiadi, Ivan Pratama
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011887/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 107 - 125
Bibliography : p. 106
Abstract
-
Physical Dimension
Number of Page(s)
xixi, 125 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00911/13
(T) 658.404 Ken P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya
Project evaluation and procurement case studies
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Financial data analysis and income recognition pada perusahaan konstruksi
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi