Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Author
Kennardi, Christian
Additional Author(s)
Setiadi, Ivan Pratama
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011887/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 107 - 125
Bibliography : p. 106
Abstract
-
Physical Dimension
Number of Page(s)
xixi, 125 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00911/13
(T) 658.404 Ken P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Last planner system terhadap performa proyek konstruksi
Studi awal tentang penyediaan alat k3 dan kecelakaan kerja pada kontraktor bersertifikasi iso di Surabaya
Infrastructure for the built environment
Faktor-faktor dalam service quality pada perusahaan konsultan perencana di Surabaya