Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Author
Kennardi, Christian
Additional Author(s)
Setiadi, Ivan Pratama
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011887/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 107 - 125
Bibliography : p. 106
Abstract
-
Physical Dimension
Number of Page(s)
xixi, 125 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00911/13
(T) 658.404 Ken P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
CPM in construction management
Analisa pengambilan keputusan pada perusahaan realestat menghadapi masa krisis
Design management
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya