Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem pengambilan keputusan bagi Kontraktor untuk mengikuti tender
Author
Abadi, Christi Dian
Additional Author(s)
Binaryadi, Edwin
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121466/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY
PROJECT MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01492/06
(T) - 658.404 Aba S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Project management
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Virtually international
Klasifikasi upah berdasarkan produktivitas pekerja, untuk berbagai macam pekerjaan konstruksi
Penerapan material requirement planning pada suatu proyek konstruksi