Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Author
Wijaya, Giri Dhamma
Additional Author(s)
Mrasiano, Felix
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011916/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 68-74
. Bibliography: p. 67 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 74 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02788/13
(T) 658.404 Wij S
-
Unavailable : Removed
Similar Collection
by author or subject
Construction management
Construction scheduling with primavera project planner
Project management for facility constructions
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"