Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia
Author
Wijaya, Irwan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20211509/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-EMPLOYEES-INSURANCE ASPECTS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 64 - 101
Bibliography: p. 62 - 63
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 101 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00728/07
(T) - 690.0608382 Wij K
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Batu alam
Value engineering in construction management
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
Construction project scheduling and control
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Analisa faktor dan uji diskriminan terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya
Prediksi kinerja waktu proyek konstruksi