Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Author
Widiartha, Ika Goldia
Additional Author(s)
Lestari, Abisaq Ayu
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011969/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 64 - 121
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02563/14
(T) SIP 1969
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi aspek-aspek kinerja owner pada proyek konstruksi
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Etika bisnis konstruksi
Analisa keuntungan potensial penerapan partnering pada perusahaan kontraktor kelas A di Surabaya
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Cara pendekatan perhitungan kuantitas pembesian pada kolom struktur beton bertulang
Pandangan kontraktor dan konsultan manajemen konstruksi terhadap peran pemilik dalam keselamatan kerja proyek konstruksi di Surabaya
Risk management pada perusahaan kontraktor yang menangani proyek pemerintah