Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Author
Widiartha, Ika Goldia
Additional Author(s)
Lestari, Abisaq Ayu
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011969/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 64 - 121
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02563/14
(T) SIP 1969
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Studi banding macam-macam denda keterlambatan penyelesaian proyek konstruksi
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Analisa studi perbandingan antara rumah toko dengan kombinasi rumah toko-stand ditinjau dari aspek pemasaran dan finansial pada proyek gateway, Sidoarjo
Sebuah database untuk sistem informasi pada construction site udbc (unified datebase for construction)
Faktor-faktor yang mempengaruhi produktivitas pekerja dalam bidang konstruksi di Surabaya