Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
Notes
Appendix: p. 167 - 308
. Bibliography: p. 165 - 166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00544/15
(T) SIP 2005
-
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Pandangan kontraktor terhadap klausul-klausul kontrak pada proyek konstruksi
Model gaya kepemimpinan yang mempengaruhi kinerja bawahan
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Direct dispplacement based design pada sistem rangka dengan ketidakberaturan pergeseran melintang terhadap bidang
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Survei mengenai biaya overhead serta faktor-faktor yang mempengaruhinya
Analisis kebutuhan konsumen dan rekomendasi perancangan perumahan dengan luas bangunan 36-70 m2