Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
Notes
Appendix: p. 167 - 308
. Bibliography: p. 165 - 166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00544/15
(T) SIP 2005
-
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Analisis kebutuhan konsumen dan rekomendasi perancangan perumahan dengan luas bangunan 36-70 m2
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi