Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 167-308
. Bibliography: p. 165-166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02644/15
(T) SIP 2005
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Computer-based construction project management
Tingkat kepentingan risiko dan respon risiko pada tahap pelaksanaan proyek kontruksi
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Studi harga satuan upah untuk proyek bangunan tinggi
Analisa faktor-faktor penyebab rework dan tingkat kesulitan pencegahannya pada pekerjaan struktur, finishing, dan mep
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Perancangan sistem informasi manajemen proses tender pada proyek konstruksi (studi kasus di PT."X")