Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 167-308
. Bibliography: p. 165-166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02644/15
(T) SIP 2005
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Legalitas redesign dan shop drawing oleh kontraktor
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Studi litelatur tentang perkembangan critical chain method
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Manajemen proyek konstruksi
Faktor sukses kunci bagi kontraktor perumahan pada real estate