Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 167-308
. Bibliography: p. 165-166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02644/15
(T) SIP 2005
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Keterkaitan kuantitas pekerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Pengaruh kinerja tim pelaksana proyek pemerintah bagi pihak kontraktor terkait cash in-flow dalam proyek konstruksi
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
Studi tentang komunikasi verbal dalam project launch meeting
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi
Program komputer untuk penyiapan kebutuhan bahan dalam proyek konstruksi
Evaluasi unsafe act dan unsafe condition pada suatu proyek