Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus pengaruh change order terhadap keterlambatan proyek pada proyek X
Author
Wiyono, Edwin Suryanata
Additional Author(s)
Hartono, Stephanus
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011804/SIP/2011
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 54 - 99
Bibliography: p. 52 - 53
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 99 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01293/12
(T) 658.924 Wiy S
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh penetapan greenship rating tools terhadap waktu pelaksanaan proyek konstruksi
Perencanaan dan pengendalian proyek PT. Triple's dalam pembangunan gedung kantor unit pelayanan PT PLN di Jatirogo
Planning, performing, and controlling projects
Project management 2.0
Faktor-faktor dalam service quality pada perusahaan konsultan perencana di Surabaya
Information systems project management
Penjadwalan proyek konstruksi
8th International Conference on Engineering, Project, and Product Management (EPPM 2017)