Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Author
Hardyanto, Hartmann
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011932/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01414/14
(T) 658.404 Har A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Studi tentang mandor, pekerja, dan kecelakaan kerja pada proyek konstruksi
Analisa keuntungan potensial penerapan partnering pada perusahaan kontraktor kelas A di Surabaya
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Analisis student center universitas Kristen Petra berdasarkan survai minat mahasiswa dan studi desain, dengan beberapa aspek pasar dan finansial
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Studi penerapan manajemen rantai pasok pengadaan material proyek konstruksi
CPM in construction management