Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Author
Hardyanto, Hartmann
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011932/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01414/14
(T) 658.404 Har A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Analisis pengaruh variabel sikap, keahlian dan pengetahuan terhadap kompentensi manajemen perusahaan konstruksi dari sudut pandang owner, konsultan dan sub kontraktor...
Analisa standar penilaian kualitas conquas pekerjaan finishing untuk proyek konstruksi di Surabaya
Analisa penjadwalan pekerjaan dinding pra-cetak
Analisa keuntungan potensial penerapan partnering pada perusahaan kontraktor kelas A di Surabaya
Studi awal tentang penyediaan alat k3 dan kecelakaan kerja pada kontraktor bersertifikasi iso di Surabaya
Evaluasi unsafe act dan unsafe condition pada suatu proyek