Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Author
Hardyanto, Hartmann
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011932/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01414/14
(T) 658.404 Har A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Cara pendekatan perhitungan kuantitas pembesian pada kolom struktur beton bertulang
Penentuan produktivitas tenaga kerja dalam kaitannya dengan usaha peningkatan produktivitas
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")
Design management
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Analisis faktor-faktor yang mempengaruhi perilaku konsumen dalam pembelian rumah menengah di Surabaya Barat
Perbandingan produktivitas pekerjaan pasangan dinding bata ringan dan bata merah pada proyek perumahan di Surabaya