Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Author
Hardyanto, Hartmann
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011932/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 81.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01414/14
(T) 658.404 Har A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pemodelan kriteria-kriteria pemilihan tower crane pada proyek konstruksi
Studi mengenai penerapan manajemen risiko oleh perusahaan kontraktor di Surabaya
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Manajemen risiko bidang operasional pada readymix concrete
Kontrol material pada proyek konstruksi perumahan
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Studi kasus pembuatan shop drawing pada proyek grande water place residences phase 1 Surabaya
Analisa keuntungan potensial penerapan partnering pada perusahaan kontraktor kelas A di Surabaya