Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Author
Orlando, Donny
Additional Author(s)
Tanjaya, Danny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No.21011762/SIP/2011
Subject(s)
LEADERSHIP
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL MANAGEMENT PROJECT
Notes
Appendix : p. 100 - 144
Bibliography : p. 97 - 99
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 144 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01868/11
(T) 690.068 Orl M
-
Unavailable : Removed
Similar Collection
by author or subject
Entrepreneurial leadership
Kepemimpinan
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Pengaruh gaya kepemimpinan terhadap komitmen organisasional dengan kepuasan karyawan sebagai mediasi pada PT. Young Multi Sarana
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Analisa kendala pelaksanaan e-procurement di kota Surabaya