Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Author
Widyastuti, Desi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000220/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 47-53
. Bibliography: p. 45-46.
Abstract
-
Physical Dimension
Number of Page(s)
x, 53 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02611/16
(T2) MTS 0220
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Project management 2.0
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Project risk management guidelines