Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Author
Hartanto, Angky
Additional Author(s)
Cahyono, Rudy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121515/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 56 - 70
Bibliography: p. 53 - 55
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00888/07
(T) - 690.068 Har F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Mengenal klaim konstruksi dan penyelesaian sengketa konstruksi
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi
Construction project planning and scheduling
Construction project scheduling and control
Human resource management in construction projects
Construction planning for engineers