Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
Author
Liedianto, William
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011934/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-EMPLOYEE MOTIVATION
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 49 - 51
. Bibliography: p. 48.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01398/14
(T) 690.068314 Lie P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Analisis prioritas kekritisan rework dan penyebabnya yang terjadi pada suatu proyek sekolah dengan menggunakan metode Failure Modes and Effects Analysis (FMEA)
Computer-based construction project management
Studi keakuratan elemen cangkang berbasis kriging dalam menganalisis cangkang yang tebalnya tidak konstan
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Proyek Sekolah Kristen Gloria Surabaya
Penerapan material requirement planning pada suatu proyek konstruksi
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta