Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Author
Chundawan, Erick
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Tesis No. 01000186/MTS/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 44 - 59
. Bibliography: p. 42 - 43 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/14
(T) 658.924 Chu M
-
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi dan evaluasi faktor-faktor kompetensi sosial manajer proyek
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Studi kasus perbandingan biaya perancah kayu, gelam dan besi pada proyek ruko di Surabaya
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Faktor-faktor penghambat value management process pada tahapan konstruksi
Construction project planning and scheduling