Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Building management by professionals
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Analisa faktor kepuasan penghuni apartemen menengah bawah di Surabaya
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi