Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang constructability concept berdasarkan sasaran proyek
Project management in construction
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Penggunaan penyelesaian sengketa pada proyek konstruksi
Mengenal klaim konstruksi dan penyelesaian sengketa konstruksi
Construction production planning and optimal control