Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manajemen proyek konstruksi
Studi tentang manajemen risiko dalam bidang manajemen konstruksi
Pandangan kontraktor dan konsultan manajemen konstruksi terhadap peran pemilik dalam keselamatan kerja proyek konstruksi di Surabaya
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Studi tentang mandor, pekerja, dan kecelakaan kerja pada proyek konstruksi