Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Manajemen proyek konstruksi
Penyiapan data harga satuan pekerjaan untuk estimasi biaya pekerjaan konstruksi baja
Etika bisnis konstruksi
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat
Penelitian dampak dari sumber daya dan strategi pada performa perusahaan konstruksi