Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis tingkat kepentingan kriteria penilaian kinerja lingkungan
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Pemakaian indeks dan kompensasi akibat inflasi pada perusahaan konstruksi
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Analisis sisa material dalam pekerjaan beton bertulang pada proyek konstruksi