Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Principles of construction management
Analisa konfik dalam perusahaan kontraktor
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya