Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh variabel sikap, keahlian dan pengetahuan terhadap kompentensi manajemen perusahaan konstruksi dari sudut pandang owner, konsultan dan sub kontraktor...
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Perencanaan elemen struktur baja berdasarkan SNI 1729 : 2015
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Studi joint risk management pada proyek konstruksi di Surabaya
Evaluasi apartemen High Point dari aspek finansial