Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Analisa penjadwalan pekerjaan dinding pra-cetak
Managing construction equipment
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Studi tentang faktor-faktor penentu dalam pemilihan jenis kontrak untuk proyek konstruksi
Planning and managing interior projects