Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan waktu tempuh ideal dan waktu tempuh aktual tower crane dalam proyek konstruksi
Author
Wiratno, Hernawan
Additional Author(s)
Hadimasta, Singgih
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011646/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 48
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 48 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00770/09
(T) - 658.924 Wir P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Studi kasus sistem informasi akuntansi pada perusahaan konstruksi PT. X
Infrastructure for the built environment
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Studi harga satuan upah untuk proyek bangunan tinggi
Karier wanita dan faktor-faktor yang berpengaruh dalam proyek konstruksi
Tingkat kepentingan dan alokasi resiko pada proyek konstruksi
Construction project administration