Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Author
Partana, Ivan
Additional Author(s)
Wanayulastri, Novidwina
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011175/IND/2007
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
Appendix: p. 96 - 176
Bibliography: p. 95
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 176 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00663/07
(T) - 658.53 Par P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pendekatan tabu search untuk penjadwalan flowshop dengan mesin pararel pada PT. "X"
Kaizen for the shopfloor
Perbandingan performance anatara algoritma NEH, BaBH dan DPH dengan kriteria minimal Makespan
Implementasi theory of constraints (TOC) guna mengoptimalkan profit di PT Teja Sekawan Cocoa Industri Surabaya
Build-to-order and mass customization
Scheduling
Penerapan perencanaan dan pengendalian produksi di CV. Indosurya Mahakam
Perencanaan pengendalian persediaan bahan baku dengan memperhatikan kapasitas gudang di perusahaan sumber jaya