Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Browse by DDC#

41.877 collection(s) found
 
Evaluasi pengaruh faktor daya terhadap konsumsi daya listrik di pt. semen gresik tuban III
Author(s)
Putra, Victor Agustono
ISBN
-
Dimension
xiv, 171 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00394/06621.319 Put ELibrary - 8th FloorAvailable
Concrete
Author(s)
Mehta, P. Kumar
ISBN
0071462899
Dimension
xxi, 659 p. / 24 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00505/06691.3 Meh CLibrary - 7th FloorAvailable
2.02884/07691.3 Meh C-Unavailable : Lost
Evaluasi pengaruh pengembangan sistem kelistrikan terhadap kapasitas peralatan di PT. Semen Gresik, Tuban
Author(s)
Rinaldi, Wira Gunawan
ISBN
-
Dimension
xvi, 294 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00395/06621.317 Rin ELibrary - 8th FloorAvailable
Construction project administration
Author(s)
Fisk, Edward R.
ISBN
0130993050
Dimension
xiv, 639 p. / 24 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00511/06624.068 Fis CLibrary - 7th FloorAvailable
2.01825/06624.068 Fis CLibrary - 7th FloorAvailable
3.04168/08624.068 Fis C-Unavailable : Removed
Perbaikan sistem pengendalian kualitas di PT. Ilufak Plaskaging
Author(s)
Wardani, Lenny
ISBN
-
Dimension
xii, 66 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00397/06658.562 War P-Unavailable : Removed
Analisa Penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa abadi sidoarjo
Author(s)
Debby, Soegianto
ISBN
-
Dimension
xviii, 280 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00398/06658.787 Soe A-Unavailable : Removed
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Author(s)
Dewi, Vincentia Anita
ISBN
-
Dimension
xii, 100 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00399/06658.787 Dew P-Unavailable : Removed
Usulan perbaikan sistem sub kontrak dengan metode kepner-tregoe di PT. Terang Fajar Persada
Author(s)
Sanchia, Jennie
ISBN
-
Dimension
xv, 71 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00400/06658.562 San U-Unavailable : Removed
Perencanaan produksi cat tembok di PT. Warnatama Cemerlang
Author(s)
Kurniawati
ISBN
-
Dimension
xiv, 141 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00401/06658.5038 Kur P-Unavailable : Removed
Penurunan prosentase cacat produk di PT.X
Author(s)
Gunawan, Henky
ISBN
-
Dimension
xv, 108 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00402/06658.562 Gun P-Unavailable : Removed
Meminimalkan loss emas di u.d. 'x'
Author(s)
Eric
ISBN
-
Dimension
xi, 73 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00403/06658.562 Eri MLibrary - 8th FloorUnavailable : Removed
Studi tentang pengukuran kinerja proses dan evaluasi inventasi in-mould-closing-device
Author(s)
Devantara, Peter Benedicto
ISBN
-
Dimension
xvii, 83 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00404/06658.54 Dev S-Unavailable : Removed
Perancangan sistem pengukuran dan peningkatan kinerja perusahaan di PT. Multipack Unggul
Author(s)
Tunggal, Darmawan
ISBN
-
Dimension
xi, 120 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00405/06658.54 Tun P-Unavailable : Removed
Business communication today
Author(s)
Bovee, Courtland L.
ISBN
0131968734
Dimension
xxiii, 585 p. / 26 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00389/06658.45 Bov BLibrary - 7th FloorAvailable
2.00390/06658.45 Bov BLibrary - 7th FloorAvailable
3.00391/06658.45 Bov B-Unavailable : Removed
Handbook of storage tank systems
Author(s)
Geyer, Wayne B.
ISBN
0824785894
Dimension
x, 347 p. / 23 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00558/06628.13 Gey HLibrary - 6th FloorAvailable
Seismic design and retrofit of bridges
Author(s)
Seible, M. J. N. Priestley F.
ISBN
047157998X
Dimension
xvii, 686 p. / 24 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00557/06624.252 Pri SLibrary - 7th FloorAvailable
Peningkatan jaminan kualitas di tool regrinding section PT. Toyota Motor Manufacturing Indonesia
Author(s)
Susanto, Hendra Gunawan
ISBN
-
Dimension
xi, 171 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00406/06658.562 Sus P-Unavailable : Removed
Performance-based optimization of structures
Author(s)
Qing, Quan Liang
ISBN
0415335949
Dimension
xix, 260 p. / 24 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00559/06624.17713 Qin PLibrary - 7th FloorAvailable
Implementasi kaizen di PT. FSCM manufacturing Indonesia
Author(s)
Muliahadi
ISBN
-
Dimension
xvii, 212 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00407/06658.562 Mul I-Unavailable : Removed
Perancangan dan pembuatan terowongan angin
Author(s)
Raharjo, Irwan
ISBN
-
Dimension
xv, 86 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00408/06629.25 Rah P-Unavailable : Removed