Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Author
Dewi, Vincentia Anita
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No: 01010982/IND/2005
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00399/06
(T) - 658.787 Dew P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sampling penerimaan atribut untuk bahan baku di PT. Agrindo
Pengurangan tingkat kecacatan dengan metode CCC-r di PT. Djarum secondary
Penurunan biaya kualitas di PT X
Perancangan sistem pengukuran performansi kualitas di PT Sentosa Alloy Industri
Evaluasi simulatif untuk membandingkan metode integrasi sistem inventory transportasi dengan metode periodic review order up to r dalam supply chain
Penurunan biaya kualitas di PT X
Total quality management
Operations and supply management