Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Author
Dewi, Vincentia Anita
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No: 01010982/IND/2005
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00399/06
(T) - 658.787 Dew P
-
Unavailable : Removed
Similar Collection
by author or subject
Problems and solutions in inventory management
Pengoptimalan bahan baku untuk produksi bola dengan metode experiment design di PT. Asia Pramulia
Operations management for competitive advantage
Perencanaan produksi dan persediaan di PT. Tirta Bahagia
Perancangan quality plan di PT Dunamos
Perancangan implementasi filosofi lean six sigma di PT Lestari Karya Makmur
Pengendalian kualitas pada proses produksi teakflooring di PT Spartawood, Sidoarjo
Perencanaan dan pengendalian produksi di Agrindo engineering unit PT. Agrindo