Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Author
Dewi, Vincentia Anita
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No: 01010982/IND/2005
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 100 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00399/06
(T) - 658.787 Dew P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengendalian persediaan sparepart dan bahan penunjang proses di PT X
Pengaruh sistem pengendalian intern atas persediaan terhadap harga pokok penjualan pada PT. KP
Upaya perbaikan dengan meminimalisasi downtime PT. Surabaya Mekabox
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
Upaya pengendalian inventori gudang produk jadi di PT. X
Identifikasi penyebab dan upaya pengurangan flowout reject quality control pada departemen IMM PT. X
Peningkatan inventory accuracy dengan meninjau ulang error handling report secara periodik di PT Schneider Electric Manufacturing Batam
ISO 9001