Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Ong, Chelsia
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen produksi
Subject(s)
MANUFACTURING ENGINEERING
PLANT LAYOUT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 56 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03515/96
L 670.42 Ong L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Djajanti Universal Gresik
Studi kelayakan pembangunan Supermarket Sinar di daerah Pondok Tjandra
Perencanaan dan pengendalian persediaan bahan baku pipa lonjor di PT Welling Jaya Sejati Industrial
LKP : positioning Matahari Departemen Store Plasa Tunjungan, pembandingan Plasa Tunjungan-Plasa Surabaya dan pembandingan Matahari Departemen Store-Galeria Matahari
Perancangan sistem manajemen pallet di PT X
LKP : PT Hapete Jalan Margomulyo Indah Surabaya-Jawa Timur
Brand babble
Manufacturing operations and supply chain management