Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi sistem manajemen k3 terhadap metode pemancangan jack-in pile
Author
Gondosiswanto, Filbert Chance
Additional Author(s)
Susanto, Garry Jaya
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011902/SIP/2013
Subject(s)
BUILDING-SAFETY MEASURES
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 56-65
. Bibliography: p. 55 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 65 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02612/13
(T) 690.22 Gon E
-
Unavailable : Removed
Similar Collection
by author or subject
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Construction equipment policy
CPM in construction management