Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi melalui penghitungan waktu baku, tata letak fasilitas, serta pemberian kompensasi di PT Surya Putra Barutama
Author
Wijaya, Chandra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021723/IND/2014
Subject(s)
PLANT LAY OUT
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix: p. 54 - 74
. Bibliography: p. 53.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 74 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01431/14
(T) 658.23 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : NV The Kenarie Soy Manufactory
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
E-manufacture
A disaggregate freight transport model for Germany
Analisis waktu pekerjaan finishing pada proyek apartemen
LKP : PT Kedawung Setia Industrial Surabaya
Materials processing
Pendekatan hybrid genetic algorithm pada penjadwalan produksi di PT. Alas Petala Makmur