Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan output aktual di line 2 finishing PT. Integra Indocabinet
Author
Chandra, Anthony
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021784/IND/2014
Subject(s)
PRODUCTION CAPACITY
PRODUCTION MANAGEMENT
Notes
Appendix: p. 60 - 98
. Bibliography: p. 59.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00898/15
(T) IND 1784
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Pengoptimalan keuntungan dengan implementasi theory of constraints (TOC) di Bengkel Nenggala Satria Surabaya
Manajemen operasi
Principles of operations management
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Manajemen produksi
Perancangan sistem manajemen kualitas berdasarkan iso 9001:2000 di PT X di Surakarta
LKP : PT Hapete Jalan Margomulyo Indah Surabaya-Jawa Timur