Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan sizing dan analisa biaya energi sistem PLTS di komunitas Desa Muara Langon, Kabupaten Paser, Kalimantan Timur
Author
Nikijuluw, Rendra Yonatan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Elektro Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01010640/ELK/2015
Subject(s)
ELECTRIC POWER-PLANTS
RENEWABLE ENERGY SOURCES
SOLAR POWER PLANTS
Notes
Appendix: p. 60-86
. Bibliography: p. 58-59.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 86 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02115/15
(T) ELK 0640
-
Unavailable : Removed
Similar Collection
by author or subject
Studi pemanfaatan energi panas bumi skala menengah sampai kecil menjadi energi listrik dengan kombinasi proses konvensional dan siklus biner untuk pembangkit listrik pedesaan di Indonesia sampai denga
Studi mengenai efisiensi sari sistem pembangkit listrik tenaga surya
Studi tentang sistem distribusi dan pembangkit tenaga listrik pada kapal kargo
Study pembangkitan tenaga listrik dengan metoda cerobong surya
Pembangkit Listrik Tenaga Surya (PLTS) Photovoltaic (PV) Energy
LKP : PLTU sektor Gresik, Gresik
Investing in renewable energy
Simulasi dan analisa potensi pembangkitan tenaga angin di Universitas Kristen Petra Surabaya menggunakan Wind Energy Assessment tool (WEA)