Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan sizing dan analisa biaya energi sistem PLTS di komunitas Desa Muara Langon, Kabupaten Paser, Kalimantan Timur
Author
Nikijuluw, Rendra Yonatan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Elektro Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01010640/ELK/2015
Subject(s)
ELECTRIC POWER-PLANTS
RENEWABLE ENERGY SOURCES
SOLAR POWER PLANTS
Notes
Appendix: p. 60-86
. Bibliography: p. 58-59.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 86 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02115/15
(T) ELK 0640
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo
LKP : PT Perkebunan XX (Persero) PG Kanigoro Madiun
Studi teknis pengoperasian diesel genset (PLTD) 3000 KVA di PT. Kayan River Indah Plywood, Sumber Mas Group Samarinda
Integration of large-scale renewable energy into bulk power systems
Evaluasi perancangan auxiliary equipments untuk pltu 25 mw di pt. adiprima suraprinta Gresik
Teknologi pembangkit listrik ramah lingkungan
LKP : PLTU sektor Gresik, Gresik
Energy conversion and management