Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Author
Sudargo, Kristianto Wibowo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021821/IND/2015
Subject(s)
MANUFACTURING PROCESS
TIME STUDY
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 76-106
. Bibliography: p. 75.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02371/15
(T) IND 1821
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan penanganan pemindahan proses packaging paku
Peningkatan penerapan 5S di divisi persiapan pengepakan PT X
Perancangan dan pengembangan produk perasan kelapa parut di PT. X
Perencanaan dan pengendalian persediaan bahan baku pipa lonjor di PT Welling Jaya Sejati Industrial
Operations and supply management
Perancangan desain PEFF dashboard untuk akurasi data actual working hour pada PT Toyota Motor Manufacturing Indonesia
Manajemen produksi dan operasi
Perancangan produksi dan pengendalian persediaan di UD. Kompas