Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Author
Sudargo, Kristianto Wibowo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021821/IND/2015
Subject(s)
MANUFACTURING PROCESS
TIME STUDY
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 76-106
. Bibliography: p. 75.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02371/15
(T) IND 1821
-
Unavailable : Removed
Similar Collection
by author or subject
LKP: PT. Wandira Kencana Alam Gresik
Improving the performance of maintenance department in PT Doulton
Upaya pengurangan waste di unit percetakaan Universitas Kristen Petra
Peranan pengembangan produk dalam meningkatkan volume penjualan pabrik alat listrik PT Broco Mutiara perwakilan Surabaya
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Sistem penjadwalan di PT. Mulya Petra
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Operations management for competitive advantage