Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Author
Sari, Maria Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021596/IND/2012
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix : p. 57
Bibliography : p. 56
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 64 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04128/12
(T) 658.542 Sar P
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Niebel's methods, standards, and work design
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Motion and time study for lean manufacturing
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia
LKP : PT Glogarindo Surabaya