Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Arta Glory Buana Sidoarjo
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Analisa standarisasi kerja operator bush forming dan pin cutting menggunakan metode tabel standar kombinasi kerja di PT. XYZ
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Pengukuran waktu kerja di departemen packaging PT Smart. Tbk.