Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Analisis produktivitas staf administrasi bagian bahan baku PT Bumi Rotan Jaya
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Perbaikan lintasan CU dengan metode line balancing di PT. XYZ
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
LKP : proses produksi di PT Supra Aspindo Jaya
Motion and time study for lean manufacturing