Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Author
Yoseano B, Raymond
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri , 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041007/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00480/06
(T) - 658.542 Yos P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi di PT Wangta Agung I
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Analisa manajemen waktu terhadap peningkatan produktivitas kerja karyawan PT. Bank "XYZ" di Kotamadya Surabaya
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
LKP : PT Djajanti Universal Gresik