Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Author
Wijaya, Fenny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040830/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 307 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/04
(T) 658.54 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
Fungsi public releations pakuwon permai dalam menyelenggarakan event untuk membina hubungan dengan konsumen
Analisis pengaruh persepsi sistem pengupahan dan disiplin kerja terhadap peningkatan kinerja karyawan PT. Tunjung Tirta Kencana
Respons masyarakat Surabaya mengenai iklan televisi "lux play with beauty"
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.
LKP : proses produksi di PT Bumi Widjaja Indah Kencana
Perancangan dan pengukuran kinerja perusahaan kaca dengan metode performance prism
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen