Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Author
Wijaya, Fenny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040830/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 307 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/04
(T) 658.54 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh persepsi sistem pengupahan dan disiplin kerja terhadap peningkatan kinerja karyawan PT. Tunjung Tirta Kencana
Fungsi public releations pakuwon permai dalam menyelenggarakan event untuk membina hubungan dengan konsumen
Respons masyarakat Surabaya mengenai iklan televisi "lux play with beauty"
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Pengukuran produktivitas kerja karyawan di pabrik kecap cap ratu di Mojokerto
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Perancangan metode pengukuran kinerja jurusan teknik industri Universitas Kristen Petra berdasarkan kriteria MBNQA