Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
Author
Wijaya, Fenny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040830/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 307 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/04
(T) 658.54 Wij P
-
Unavailable : Removed
Similar Collection
by author or subject
Respons masyarakat Surabaya mengenai iklan televisi "lux play with beauty"
Fungsi public releations pakuwon permai dalam menyelenggarakan event untuk membina hubungan dengan konsumen
Analisis pengaruh persepsi sistem pengupahan dan disiplin kerja terhadap peningkatan kinerja karyawan PT. Tunjung Tirta Kencana
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera
Pengalokasian operator pada lantai produksi PT X
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
LKP : PT. Makmur Jaya Kharisma