Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.
Author
Valiant, Bernardus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022161/IND/2018
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 52-57
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 57 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03321/18
(T) IND 02-2161
Library - 8th Floor
Available
Similar Collection
by author or subject
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Optimalisasi jumlah kebutuhan tenaga kerja dengan menggunakan metode line balancing di PT X
LKP : PT Tri Anugerah Metalindo
LKP : PT Arika Kharisma Agung
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Improving the performance of maintenance department in PT Doulton
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.