Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa standar waktu potong dan layout gudang 10 PT. Spindo 1
Author
Eko S., Daniel
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041352/IND/2009
Subject(s)
TIME STUDY
PLANT LAYOUT
Notes
Appendix : p. 96 - 158
Bibliography : p. 95
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03066/09
(T) 658.54 Eko A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan produksi di PT, "X"
Penentuan reward di PT Fuboru Indonesia
The design of the factory with a future
Perancangan ulang tata letak fasilitas pada PT Segatama Lestari
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa
LKP : mesin pengerusan garam di PT Metalco
Upaya peningkatan produktivitas dengan pengukuran kapasitas dan perancangan layout di PT FSCM Manufacturing Indonesia divisi kabel