Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa standar waktu potong dan layout gudang 10 PT. Spindo 1
Author
Eko S., Daniel
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041352/IND/2009
Subject(s)
TIME STUDY
PLANT LAYOUT
Notes
Appendix : p. 96 - 158
Bibliography : p. 95
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03066/09
(T) 658.54 Eko A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Facilities design
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Safety with machinery
Perancangan tata letak fasilitas produksi dengan pendekatan simulasi di CV. XYZ
Perancangan tata letak area produksi di PD Aneka Jasa dan Permesinan Unit Kalimas, Surabaya
Motion and time study
LKP : perusahaan mie cap burung elang Jl. Rantauan Darat 12 Banjarmasin 70243
Re-layout at Raffles production line PT Schneider Electric Manufacturing Batam using line architecture design methodology