Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Re-layout at Raffles production line PT Schneider Electric Manufacturing Batam using line architecture design methodology
Author
Soegianto, Selvy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Universitas Kristen Petra, 2010
Language
English
ISBN
-
Series
Skripsi No. 01021430/IND/2010
Subject(s)
PLANT LAYOUT
Notes
Appendix : p. 84 - 175
Bibliography : p. 83
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 175 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01426/12
(T) 658.23 Soe R
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis perbandingan kombinasi Genetic Algorithm dan Simulated Annealing dengan Particle Swarm Optimization (studi kasus di CV X)
Inovasi pemrosesan barang pada sistem inventori di Sinar supermarket cabang Jemur Andayani
Penataan ulang tata letak fasilitas di PT. XYZ
Perencanaan penataan ulang fasilitas pada departemen produksi bipang dan permen di PT. XYZ
LKP : evaluasi keseimbangan lintasan dan tata letak pabrik pada PT Paberik Pharmasi "Vita"
Perancangan tata letak fasilitas menggunakan algoritma tabu search di PT Wim Bicycle
LKP : pengendalian persediaan bahan baku amoniak dan analisa manajemen sumber daya manusia di PT Utama Malang
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa