Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan efisiensi man power melalui pencapaian line balancing dan perbaikan process flow pada spin on filter assembly line 2 di PT X
Author
Hartanto, Christorio Indriyadi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041348/IND/2009
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION PLANNING
INDUSTRIAL MANAGEMENT
PLANT LAYOUT
Notes
Appendix : p. 57 - 68
Bibliography : p. 56
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03390/09
(T) 658.5 Har P
-
Unavailable : Lost
Similar Collection
by author or subject
Management
Perbandingan sistem reorder point dengan distribution resource planning di PT.X.
Inventory management and production planning and scheduling
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Managing supply chains
Perancangan budaya 5S di PT Karya Murni Indocipta
Understanding business
Optimalisasi tata letak lantai produksi snc PT. SEMB PEM