Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Author
Melvi, Tjiang
Additional Author(s)
Christian R. K.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011792/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03608/11
(T) 690.068 Mel S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Studi tentang mandor, pekerja, dan kecelakaan kerja pada proyek konstruksi
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"