Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran waktu istirahat untuk pengguna komputer
Author
Syntia, Yenny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02011036/IND/2006
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
ix, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03569/06
(T) - 658.542 Syn P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Optimalisasi jumlah kebutuhan tenaga kerja dengan menggunakan metode line balancing di PT X
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Pengurangan lead time produksi mcset di PT. Schneider Indonesia