Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Author
Prajogo, Erwin Setyo
Additional Author(s)
Tistogondo, Yunaedy
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 04010825/IND/2004
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 123 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03644/04
(T) 658.54 Pra E
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Perbaikan penanganan pemindahan proses packaging paku
Optimalisasi jumlah kebutuhan tenaga kerja dengan menggunakan metode line balancing di PT X
Niebel's methods, standards, and work design
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa program manajemen bisnis
LKP : pengukuran waktu kerja dan peta peta kerja di CV Phoenix Mas Lombok Barat
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire