Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Author
Tanuwijaya, Henky J.
Additional Author(s)
Gani, Saldy
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek
Subject(s)
MOTION STUDY
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 49 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06404/98
L 670.42 Tan L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Pengukuran kinerja dan usulan perbaikan di perusahaan rokok dwi tunggal.
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Perencanaan kebutuhan bahan baku dan pengendalian produksi dalam usaha pemenuhan permintaan di PT. Mega Citra First
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Perencanaan penjadualan metode heuristic neh dengan memperhatikan biaya waste pada perusahaan plastik
Perancangan metode pengukuran kinerja jurusan teknik industri Universitas Kristen Petra berdasarkan kriteria MBNQA
Pengukuran kinerja di PT X dengan metode balanced scorecard
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.