Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan jobshop di CV Sinar Indah Teknik
Author
Kusuma, Felicia Anggun
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022026/IND/2016
Subject(s)
MOTION STUDY
TIME STUDY
SCHEDULING
Notes
Appendix: p. 52-81
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02545/16
(T) IND 2026
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Motion and time study for lean manufacturing
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Perancangan penjadualan pada departemen produksi di CV. Kayu Murni
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
LKP : analisa produktivitas berdasarkan output baku pada sistem produksi PT Waradia Utama
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X
Identifikasi penyebab dan upaya pengurangan flowout reject quality control pada departemen IMM PT. X