Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan jobshop di CV Sinar Indah Teknik
Author
Kusuma, Felicia Anggun
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022026/IND/2016
Subject(s)
MOTION STUDY
TIME STUDY
SCHEDULING
Notes
Appendix: p. 52-81
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02545/16
(T) IND 2026
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Upaya peningkatan kapasitas produksi stasiun giling dan efisiensi pekerja stasiun press bale di mitra produksi sigaret PT X
Penentuan frekuensi perencanaan ulang master production schedule dan ukuran produksi yang optimal
Upaya pengelolaan manajemen waktu kunjungan untuk menunjang pertumbuhan volume penjualan produk pakaian tidur di lima kantong pasar di Surabaya
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Analisis perbandingan empat algoritma daerah sekitar untuk kasus penjadwalan
Monitoring penjadwalan proyek dan evaluasi jumlah tower crane pada proyek condominium dan podium sebuah plaza di tengah kota
Analisis available time pada mesin A di PT. XYZ