Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
Author
Evelyn
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040829/IND/2004
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xix, 302 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03724/04
(T) 658.54 Eve P
-
Unavailable : Lost
Similar Collection
by author or subject
Analisa upah, locus of control dan perilaku kerja pekerja PT. Trisakti Cipta Nusantara Surabaya
Komunikasi interpersonal antara anak agnostik dengan orang tua beragama
Pengukuran kapasitas produksi di pt "xyz"
Analisa tata letak ruang Gedung K lantai dasar Universitas Kristen Petra
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
LKP : PT Dharma Satya Nusantara Jl. Kapt. Dharmo Sugondo Gresik
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya