Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Productivity improvement by mtm analysis at PT Schneider Electric
Author
Sulistyaningsih, Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040930/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00627/06
(T) - 658.542 Sul P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengalokasian operator pada lantai produksi PT X
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Pengukuran waktu istirahat untuk pengguna komputer
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Peningkatan kapasitas produksi di PT Wangta Agung I
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X