Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Productivity improvement by mtm analysis at PT Schneider Electric
Author
Sulistyaningsih, Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040930/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00627/06
(T) - 658.542 Sul P
-
Unavailable : Removed
Similar Collection
by author or subject
Usulan perbaikan fasilitas kerja pemotongan kabel divisi cable casing di PT. Insera Sena
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Analisa standar waktu potong dan layout gudang 10 PT. Spindo 1
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Upaya peningkatan kapasitas produksi stasiun giling dan efisiensi pekerja stasiun press bale di mitra produksi sigaret PT X
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan