Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Productivity improvement by mtm analysis at PT Schneider Electric
Author
Sulistyaningsih, Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040930/IND/2005
Subject(s)
TIME STUDY
MOTION STUDY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 140 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00627/06
(T) - 658.542 Sul P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Peningkatan produktivitas mesin EFC-201 di PT Spindo Surabaya
Penentuan jumlah tenaga kerja bagian pengepakan kabinet PT X
Analisis available time pada mesin A di PT. XYZ
Perhitungan waktu baku dan optimalisasi kebutuhan tenaga kerja di PT Smart, Tbk.
Penjadwalan jobshop di CV Sinar Indah Teknik
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Time and management