Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Author
Japar, Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041217/IND/2007
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix: p. 48 - 64
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 64 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01639/08
(T) - 658.542 Jap M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan konsistensi data dan pengurangan waktu kerja sistem penilaian mesin dan karyawan di PT. XYZ
Methods, standards, and work design
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
LKP : perusahaan mie cap burung elang Jl. Rantauan Darat 12 Banjarmasin 70243
Penentuan reward di PT Fuboru Indonesia
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Upaya peningkatan kapasitas produksi stasiun giling dan efisiensi pekerja stasiun press bale di mitra produksi sigaret PT X