Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Author
Japar, Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041217/IND/2007
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix: p. 48 - 64
Bibliography: p. 47
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 64 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01639/08
(T) - 658.542 Jap M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya
Rancangan perbaikan standar metode kerja berdasarkan micromotion study untuk mengurangi motion waste
Evaluasi target pada bagian presshop line tube spot di PT. Inti Pelangi Drumasindo
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Usulan perbaikan fasilitas kerja pemotongan kabel divisi cable casing di PT. Insera Sena
Motion and time study design and measurement of work