Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan perbaikan fasilitas kerja pemotongan kabel divisi cable casing di PT. Insera Sena
Author
Setiawan, Anthony T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021614/IND/2012
Subject(s)
TIME STUDY
FACILITY MANAGEMENT
FACTORY MANAGEMENT
Notes
Appendix : p. 27 - 33
Bibliography : p. 26
Abstract
-
Physical Dimension
Number of Page(s)
xii, 33 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04568/12
(T) 658.2 Set U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Motion and time study for lean manufacturing
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
Improving the performance of maintenance department in PT Doulton
Peningkatan produktivitas pembersihan sarang burung di CV X dengan pendekatan ergonomi
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Pengoptimalan kapasitas produksi pail can di PT. Intipelangi Drumasindo
LKP : PT Djajanti Universal Gresik
Optimalisasi kapasitas untuk memenuhi perencanaan produksi di PT X