Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan perbaikan fasilitas kerja pemotongan kabel divisi cable casing di PT. Insera Sena
Author
Setiawan, Anthony T.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021614/IND/2012
Subject(s)
TIME STUDY
FACILITY MANAGEMENT
FACTORY MANAGEMENT
Notes
Appendix : p. 27 - 33
Bibliography : p. 26
Abstract
-
Physical Dimension
Number of Page(s)
xii, 33 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04568/12
(T) 658.2 Set U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Perbaikan fasilitas kerja dan perancangan metode kerja dengan memperhatikan aspek ergonomi di pt jatim bromo steel
Usulan perbaikan sistem kerja dan perancangan fasilitas kerja dengan pendekatan ergonomi di CV. Gunawan Putra
Perbaikan fasilitas kerja divisi decal preparation di PT. Insera Sena
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Facilities design
LKP : analisa produktivitas berdasarkan output baku pada sistem produksi PT Waradia Utama
Perencanaan kebutuhan material di PT. Weber Indahutama