Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
Author
Heryanto, Roby
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022110/IND/2018
Subject(s)
LEAN MANUFACTURING
SIX SIGMA
TIME STUDY
Notes
Appendix: p. 64-84
. Bibliography: p. 63 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01437/18
(T) IND 2110
Library - 8th Floor
Available
Similar Collection
by author or subject
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Diskriminasi struktur proses produksi dalam domain frekuensi dengan menggunakan transformasi fast fourier serta prngujian kolmogorof smirnov
LKP : analisa produktivitas berdasarkan output baku pada sistem produksi PT Waradia Utama
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Perbaikan fasilitas kerja divisi decal preparation di PT. Insera Sena
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Perencanaan kebutuhan material di PT. Indogarmen
Upaya pengalokasian operator in-line QC di PT Smart Tbk.