Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
Author
Heryanto, Roby
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022110/IND/2018
Subject(s)
LEAN MANUFACTURING
SIX SIGMA
TIME STUDY
Notes
Appendix: p. 64-84
. Bibliography: p. 63 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01437/18
(T) IND 2110
Library - 8th Floor
Available
Similar Collection
by author or subject
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Analisa standar waktu potong dan layout gudang 10 PT. Spindo 1
Usulan improvement moulding plan di PT. X
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Motion and time study
Pengalokasian operator pada lantai produksi PT X
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Motion and time study design and measurement of work