Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Author
Subiakto, Bonifasius Taufik
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040818/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03713/04
(T) 658.5 Sub P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Updating bill of material produk filter di PT X
Penjadwalan produksi komponen produk paddy husker tipe head HC 6 BV di PT. Agrindo
Penjadwalan tenaga kerja dengan menggunakan metode integer linear programming dan heuristik di perusahaan plastik "X"
Perancangan modul sebagai tools dalam penerapan hpwt di PT "X"
Pengoptimalan kapasitas produksi pail can di PT. Intipelangi Drumasindo
Diskriminasi struktur proses produksi dalam domain frekuensi dengan menggunakan transformasi fast fourier serta prngujian kolmogorof smirnov