Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
Author
Subiakto, Bonifasius Taufik
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040818/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03713/04
(T) 658.5 Sub P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan produksi di CV. Sidodadi Jaya
Analisa produktivitas di perusahaan air minum mineral dengan menggunakan metode omax
Kaizen for the shopfloor
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Upaya meminimasi bottle-neck di lini produksi PT. Halimjaya Sakti dengan pendekatan simulasi
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Upaya penurunan jam kerja Reconstituted Tobacco Clove (RTC) line di primary processing department PT HM Sampoerna, Tbk
Lean manufacturing that works