Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Author
Gandasutisna, Priscilla
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022003/IND/2016
Subject(s)
MOTION STUDY
TIME STUDY
PLAN LAYOUT
Notes
Appendix: p. 56-89
. Bibliography: p. 55.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02567/16
(T) IND 2003
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
Perbandingan product layout dan process layout dalam perbaikan tata letak PT. Almicos Pratama dengan metode simulasi
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
Facilities design
Perbaikan tata letak fasilitas departemen sheet metal 1 pada PT. Mustikarama Citraperdana
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera