Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Author
Firstiana, Emia Yusnita
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041025/IND/2006
Subject(s)
TIME STUDY
PRODUCTION MANAGEMENT
TOTAL QUALITY MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01662/06
(T) - 658.542 Fir E
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT XYZ
Analisis penerapan standard operational procedure dalam proses produksi pada PT Pertiwimas Adi Kencana
Analisis pengaruh kualitas pelayanan tour leader terhadap loyalitas konsumen di travel agent Surabaya
Perancangan perbaikan kualitas layanan service centre "X" di Surabaya
Beyond total quality management
Penentuan pergantian mata pisau potong pada mesin extruder besar line 40 dengan pendekatan simulasi di PT X
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi