Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Author
Wibowo, Surya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041356/IND/2009
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xi, 52 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03055/09
(T) 658.542 Wib P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan timbal balik antara kinerja sosial perusahaan dan kinerja keuangan perusahaan yang diukur menggunakan price earning ration
Penekanan harga pokok produk dengan efisiensi biaya kualitas; suatu studi kasus pada PT Keramik Paolo di Probolinggp
Upaya peningkatan output produksi PT. Spindo di gudang VII unit I
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
Analisis dan perancangan perbaikan sistem perencanaan produksi di PT. X
Operasi
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Pengoptimalan sistem kanban internal lantai 3 di PT. Schneider Electric Manufacturing Batam