Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Author
Wibowo, Surya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041356/IND/2009
Subject(s)
INVENTORY CONTROL
PRODUCTION MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xi, 52 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03055/09
(T) 658.542 Wib P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan timbal balik antara kinerja sosial perusahaan dan kinerja keuangan perusahaan yang diukur menggunakan price earning ration
Pengaturan pembelian bahan baku dengan model pemesanan multiple item cv. setia kawan di Tulungagung
Penurunan biaya kualitas di PT X
Pengendalian persediaan bahan baku dengan metode MRP pada PT. Halim Jaya Sakti
ERP
Sistem produksi toyota
Operation management for competitive advantage
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)