Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda

Author
  • Andriyanto
Additional Author(s)
-
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Tugas akhir no. 98.54.292
Subject(s)
  • TIME MEASUREMENT
  • TIME STUDY
  • WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 91 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
# Accession No. Call Number Location Status
1.01571/98(T) 658.542 And P-Unavailable : Removed
2.01572/98(T) 658.542 And PLibrary - 8th FloorUnavailable : Removed

Similar Collection

by author or subject