Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa peningkatan fasilitas untuk meningkatkan produktivitas di departemen spinning di PT Lotus Indah Textile
Author
Prabowo, Eka Rihantoro
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011017/IND/2005
Subject(s)
TIME STUDY
WORK MEASUREMENT
INDUSTRIAL PRODUCTIVITY
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 102 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01626/06
(T) - 658.54 Pra A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Value stream mapping proses operasional uniform di PT. X
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Perancangan metode dan fasilitas kerja di PT Niki Tunggal dengan menggunakan pendekatan ergonomi
LKP : mesin pemotongan dan pembentukan kayu di PT Margo Mulya Surya Perkasa
Standarisasi aliran proses dan informasi pada departemen transport di PT. A
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Pengukuran kinerja unit X di universitas Y