Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis lead time kontainer dengan simulasi value stream mapping di PT X
Author
Hartanto, Ricky Setiawan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022115/IND/2018
Subject(s)
DELIVERY OF GOODS
WORK MEASUREMENT
WASTE MINIMIZATION
TIME STUDY
Notes
Appendix: p. 61-73
. Bibliography: p. 60 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01441/18
(T) IND 2115
Library - 8th Floor
Available
Similar Collection
by author or subject
Pengukuran kapasitas produksi di pt "xyz"
Perancangan metode dan fasilitas kerja di janfu garment dengan pendekatan ergonomi untuk meningkatkan produktifitas pekerja
Upaya pengurangan motion waste pada testroom segmen produk 1170 di PT. E-T-A Indonnesia
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Penerapan value stream mapping dalam mengidentifikasi dan mengurangi waste pada gudang PT. X
Perancangan metode dan fasilitas kerja di PT Niki Tunggal dengan menggunakan pendekatan ergonomi